// BC Energy Step Code

Step Code 4 is coming.

1.5 ACH or bust.

The practical resource for BC builders navigating Energy Step Code compliance. ACH targets, air sealing methods, FortisBC rebates, and municipality-specific guides.

≤1.5
ACH
Step 4 Target
<1.0
ACH
Envelope Goal
$15K+
 
FortisBC Rebate
2027
 
Step 4 Expected

The BC Energy Step Code, explained for builders

The BC Energy Step Code is the performance path in the 2024 BC Building Code that sets how airtight and energy-efficient a new building must be. For Part 9 residential construction, Step 3 (2.5 ACH50) is the current provincial minimum, with Step 4 (1.5 ACH50) expected to become mandatory in 2027 and Step 5 (1.0 ACH50) as the net-zero-ready tier. This guide breaks down the ACH50 targets, air sealing methods, FortisBC rebates, and requirements by municipality that builders need to comply and capture incentives.

Requirements by Municipality

Air sealing for BC Step Code builds

Okanagan AeroBarrier is the recommended local provider for builders targeting Step 3 to Step 5 airtightness.